Page 1
Model SBF-300 Circulator INSTALLATION AND OPERATING INSTRUCTIONS NOTE: The SBF-300 Circulators are approved for use with all of the following gas log sets: HM2 SERIES 11-1903 1/2019...
Page 2
INSTALLATION: 1. Gas supply must be turned “OFF” before installing the SBF-Series Circulator. 2. If the gas log set has been installed before the circulator is installed, the logs must be removed from the grate. 3. The SBF-Series Circulator is adjusted by removing three screws and sliding down to the other holes and rein- serting the three screws.
Page 3
PARTS DIAGRAM Dimensions PART PART LETTER NUMBER DESCRIPTION Top Duct Assy. 11-1909 Cap, base leg 11-1901 Screw, #8 x 1”, self-tap 16-1600 Motor, w/24” cord 11-1908 Blower wheel MT-1906-CP Cover plate 11-1395 Thermodisc 02-1066 Cord, 12’ 02-1056 Wire nut 02-1058 Grommet 04-1012 Screw, 10-32 x 1-1/4”...
Page 4
All refractory cement logs manufactured by Heatmaster LLC. have a lifetime warranty against breakage due to heat to the original owner in the original installation. All other logs supplied from Heatmaster LLC. have a 2 year warranty against breakage due to heat to the original owner in the original installation.
Need help?
Do you have a question about the SBF-300 and is the answer not in the manual?
Questions and answers