Download Print this page

GE Monogram ZXD27B Installation Instructions

Custom panel accessory kit

Advertisement

Quick Links

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.GEAppliances.com.
BEFORE YOU BEGIN
Read these in struc tions care ful ly and completely.
IMPORTANT
local in spec tor's use.
IMPORTANT
and ordinances.
• Note to Installer – Be sure to leave these instructions
with the consumer.
• Note to Consumer – Keep these instructions for future
reference.
• Skill level – Installation of this custom panel kit requires
a qualified installer or service technician.
• Proper installation is the responsibility of the installer.
• Product failure due to improper installation is NOT
covered under the warranty.
TOOL AND MATERIALS REQUIRED
• Safety Glasses
• Phillips screwdriver
• Drill and appropriate bits (Brad point recommended for
drilling through wood panels)
• Custom panel
• Custom handle (optional)
• Adhesive recommended for metal to wood
• Adhesive recommended for plastic to wood
PARTS SUPPLIED
• Lamp Jewel
• Metal mounting panel
• Bag of #6 size screws
This kit contains a mounting panel to support a trimless
custom drawer front up to 3/4" thick. The tubular handle
can be reinstalled onto the custom panel with longer
screws (not provided). Or, the original handle can be
replaced with a custom handle of your choice. (Handle
is not supplied.) Choose a custom handle to match or
complement cabinetry hardware.
IMPORTANT: The warming drawer should be installed
according to the installation instructions packed with the
product. The original drawer front will be removed and
replaced with a custom panel.
• Cut edges of the drawer panel will be seen and must be
finished for best appearance.
49-8969-3 07-14 GE
Save these instructions for
Observe all governing codes
WARMING DRAWER CUSTOM PANEL
ACCESSORY KIT - ZXD27B and ZXD30B
For installation of 27" and 30" wide warming drawer
custom panel and custom handle.
• The custom drawer front panel, both raised and flat
design, should be constructed in the same manner as
typical cabinet doors.
• Order the custom drawer panel from the cabinet
manufacturer. Be sure to provide the exact dimensions
so that the panel is constructed accurately.
• Order the optional custom handle to complement or
match surrounding cabinetry handles.
PREPARE DRAWER FOR PANEL
STEP 1
INSTALLATION
• Open the drawer fully.
• Turn the warming drawer off.
REMOVE ORIGINAL DRAWER
STEP 2
FRONT
• Remove seven #8 screws. Remove four from top inside
and three from bottom. Set these screws aside – they
are no longer needed.
– Support the drawer front as you remove screws to
prevent the possibility of falling.
PREPARE CUSTOM PANEL
STEP 3
• The custom panel size is determined by the cabinetry
dimensions and spacings.
• Once the custom panel size is determined, place
the metal panel on the custom panel and check the
squareness and correct placement of the metal panel,
and mark the hole for the indicator light. Confirm that
the hole marking provides the indicator light to the right
side of the custom panel appearance side.
• Drill a 5/16" hole. A Brad point drill bit is recommended.
1

Advertisement

loading

Summary of Contents for GE Monogram ZXD27B

  • Page 1 Instructions For installation of 27” and 30” wide warming drawer custom panel and custom handle. Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.GEAppliances.com. BEFORE YOU BEGIN • The custom drawer front panel, both raised and flat design, should be constructed in the same manner as Read these in struc tions care ful ly and completely.
  • Page 2 Place the jewel into the drilled hole. Custom Handle or Original Handle This Side Appearance Against Insert Side Wood Jewel NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. 49-8969-3 07-14 GE...

This manual is also suitable for:

Monogram zxd30b