Download Print this page
GE Monogram ZXD27B Installation Instructions
GE Monogram ZXD27B Installation Instructions

GE Monogram ZXD27B Installation Instructions

Advertisement

Quick Links

Installation
Instructions
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT
for local inspector's use. Observe all governing
codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions with
your Owner's Manual for future reference.
TOOL AND MATERIALS REQUIRED
• Phillips screwdriver
• Drill and appropriate bits
(Brad point recommended for drilling through
wood panels)
• Custom panel
• Custom handle (optional)
• Adhesive recommended for metal to wood
• Adhesive recommended for plastic to wood
PARTS SUPPLIED
• Lamp Jewel
• Metal mounting panel
This kit contains a mounting panel to support a
trimless custom drawer front up to 3/4" thick. The
tubular handle can be reinstalled onto the custom
panel with longer screws (not provided). Or, the
original handle can be replaced with a custom
handle of your choice. (Handle is not supplied.)
Choose a custom handle to match or complement
cabinetry hardware.
IMPORTANT: The warming drawer should be
installed according to the installation instructions
packed with the product. The original drawer front
will be removed and replaced with a custom panel.
• Cut edges of the drawer panel will be seen and
must be finished for best appearance.
• The custom drawer front panel, both raised and
flat design, should be constructed in the same
manner as typical cabinet doors.
• Order the custom drawer panel from the cabinet
manufacturer. Be sure to provide the exact
dimensions so that the panel is constructed
accurately.
• Order the optional custom handle to complement
or match surrounding cabinetry handles.
– Save these instructions
WARMING DRAWER CUSTOM
PANEL ACCESSORY KIT
ZXD27B
For installation of 27" and 30" wide
warming drawer custom panel and
ZXD30B
custom handle.
PREPARE DRAWER FOR
STEP 1
PANEL INSTALLATION
• Open the drawer fully.
• Turn the warming drawer off.
REMOVE ORIGINAL
STEP 2
DRAWER FRONT
• Remove the two screws on each side and the
one screw at the bottom of the drawer edge.
• Remove the two screws on the inside of the
drawer at the top. Retain all screws.
– Support the drawer front as you remove
screws to prevent the possibility of falling.
PREPARE CUSTOM PANEL
STEP 3
• The custom panel must be sized to fit the
dimensions shown for your model.
• Drill a 5/16" diameter hole through the
appearance side of the panel. This hole will
allow the indicator "ON" light to be visible
through the custom panel. The cut edges will
be covered by the overlap of the lamp jewel.
– A Brad point drill bit is recommended.
10-1/2"
Drill 5/16" Dia.
Through Custom
Panel For Lamp Jewel
A
1-13/16"
1-3/4"
A = 26-3/4" for 27" Wide Models
A = 30" for 30" Wide Models

Advertisement

loading

Summary of Contents for GE Monogram ZXD27B

  • Page 1 WARMING DRAWER CUSTOM Installation PANEL ACCESSORY KIT ZXD27B For installation of 27″ and 30″ wide Instructions warming drawer custom panel and ZXD30B custom handle. BEFORE YOU BEGIN PREPARE DRAWER FOR STEP 1 Read these instructions completely and carefully. PANEL INSTALLATION IMPORTANT •...
  • Page 2 SECURE CUSTOM PANEL INSTALL LAMP JEWEL STEP 4 STEP 6 TO METAL MOUNTING Turn the assembly appearance side up. PANEL • Use plastic to wood adhesive to secure the lamp jewel to the front of the wood panel. On the side •...

This manual is also suitable for:

Monogram zxd30b