  • Page 1 Version: 1.0 EN / Item no.: 00601-3-905 Mounting instructions PS 120 – 500 M1/M2 on AS 1200 M1 Please read carefully before initial operation! ORIGINAL OPERATING MANUAL...
  • Page 2 Contents These parts must be available ......................2 Mounting PS 120-500 M1/M2 ........................ 2 Installation of headstock and access platform for seeder ............2 PS – Installation .......................... 4 Dispersion plate assembly and hose routing ..................4 Dispersion plate assembly ......................4 Hose routing ..........................
  • Page 3 Install the headstock on the AS 1200 (Figure 5). • Install the access platform with the access platform carriers on the frame of the jacks (Figure 6). • Figure 5 Figure 6 Install the ladder at the rear end of the access platform (Figure 7). •...
  • Page 4 2.2 PS – Installation Install the PS 120-500 with the hose • outlets in the direction of travel. Fasten the PS with the supplied bolts (Figure 10). Figure 10 Dispersion plate assembly and hose routing 3.1 Dispersion plate assembly Install the dispersion plates with the brackets on the front cross connection of the tine bed frame •...
  • Page 5 For the left side of the harrow, the left outlets of the PS500 are used – for the right side of the • harrow, the right outlets of the PS500 are used. Route the hoses downwards in a wide arc (Figures 13 and 14).
  • Page 6 The hoses for the next closest tine beds are routed along the side frame and fastened with cable • ties (Figure 17). The hoses to the dispersion plates on the tine bed are routed through the pivot point of the •...
  • Page 7 The hoses for the outer tine beds are routed along the side frame and fastened with cable ties • (Figure 21). As shown in the image, the hoses to the dispersion plates are routed and fastened on the tine • bed.
  • Page 8 Email: office@apv.at Fax: +43 (0) 2913 / 8002 Web: www.apv.at Legal notice: APV - Technische Produkte GmbH, Managing director: Ing. Jürgen Schöls, Dallein 15 3753 Hötzelsdorf, Austria, marketing@apv.at, www.apv.at, UID: ATU 5067 1107 Photos: Company photos (© APV) Page 8...