Pentair EVERPURE CONSERV LT-S Manual page 15

High efficiency reverse osmosis (ro) processor
Table of Contents

Advertisement

3. Adjust the mixing valve if needed and run blended water
for two (2) minutes. Discard this water.
4. Repeat Steps 3, 4 and 5 until the light indicators change
between solid blue and flashing blue. The blended water
TDS should now be at 80 ppm.
10
Install the Everpure
Locate the 4CC Cartridge and inspect the o-rings. They
should be clean and lightly lubricated with silicone grease.
1. Turn power OFF.
2. Remove the port plug.
3. Line up the tabs on the 4CC Cartridge with the slots in
the opening on the front side of the head assembly. See
Figure 6 and insert the cartridge to full depth.
4. Rotate the cartridge 900 to the right (clockwise) to lock it
in place.
1
2
Figure 11
11
Flush Storage Tank and Everpure
Flush the Everpure 4CC Mineral Cartridge:
The 4CC Mineral Cartridge will be flushed when the storage
tank is flushed. No further flushing is required.
Storage Tank:
The Storage Tank will hold approximately 3 gals (11.3 L). The
tank air pressure is preset to 5-7 psi (0.34 bar, 0.034 MPa)
when shipped via ground transportation. For air shipments
the precharge is completely removed. Check the tank air
pressure. Ensure that the tank has 5-7 psi (0.34 bar, 0.034
MPa) of precharge upon installation. Add air if needed. Tank
pressure may be checked using an air pressure gauge on the
air valve on the side of the tank.
EVERPURE
CONSERV
®
4CC Mineral Cartridge:
®
4CC Cartridge:
®
LT-S HIGH EFFICIENCY RO SYSTEM INSTALLATION AND OPERATION GUIDE
®
Blended
Water Outlet
Figure 12
1. OPEN the ball valve on the top of the Storage Tank.
2. CLOSE the ball valve at the blended water out tubing.
3. Apply power. It will take approximately two (2) hours for
the Storage Tank to fill.
4. The pump turns off when the Storage Tank is full. OPEN
the ball valve for the blended water outlet. Allow the
Storage Tank to empty.
5. Repeat Steps 2, 3 and 4 four (4) more times.
PLACE THE CONSERV LT-S PROCESSOR INTO
OPERATION
1. Remove the ball valve from the end of the blended water
outlet.
2. Connect the blended water outlet tubing to the
application.
TESTING YOUR REVERSE OSMOSIS PROCESSOR
Total Dissolved Solids (TDS) Test
Under NSF/ANSI Standard 58, it is highly recommended that
the blended water be tested at least every six (6) months to
verify that the processor is performing satisfactorily.
CAUTION: Visually check the entire processor for leaks. If a
leak is present, see Troubleshooting.
NOTE: Initially, the water may appear cloudy. This is a result
of air trapped in the postfilter cartridge. It is not
harmful and will disappear in a matter of minutes.
It may take up to a week after installing a new
postfilter cartridge for the trapped air to dissipate.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents