Insulation of the connections
and the storage tank
NOTE
Insulate in accordance with applicable local
standards and guidelines/directives.
1.
Check all hydraulic connections for leaks. Perform
leak test.
2.
Insulate all connections and pipes.
NOTE
The function of the pressure relief device must
be checked at regular intervals.
Draining
The storage tank is drained via the drain valve.
For position: dimensioned drawing for respective
model.
Shut-off valves must remain closed during draining.
The connection at the hot water outlet should be open
to the atmosphere.
Subject to change without notice | 83018600hUK – Translation of the original operating manual | ait-deutschland GmbH
9