Preparation - The Balance - PCE Group AB Series User Manual

Table of Contents

Advertisement

8
____________________________________________________________________________________________________________________
7. Preparation – the balance
1. Take the balance and supplied accessories (a feeder, pan elements) out of the box.
2. Place the balance on a stable ground not affected by mechanical vibrations and
airflows.
3. Level the balance with rotating rear legs so that the air bubble in water-level at the
back of the balance is in the middle.
4. Gently place the pan on the balance.
5. Plug a feeder to the power socket at the back of the balance.
Moisture in the air may condense on the surface of the balance when
transferred to the warmer environment. In this case leave the balance for at
least 4 hours unplugged from the mains for conditioning to avoid wrong
operating or damage of the balance.
Leave the pan empty and plug the feeder to the mains. At the end of self-tests, the
balance displays zero indication and is now ready to work.
USER MANUAL
www.pce-group-europe.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pce-ab-100Pce-ab-200

Table of Contents