5.0 OPERATION OVERVIEW
3.
Vacuum motor should fill loader
until 5 seconds before pellets stop
moving through the convey hose
and no more.
2.
Press button
to turn on
loader and adjust load time
with + buttons.
Rotate to change air
inlet opening
1.
The feed tube joins air with material and it should
be plunged (and kept) in the material supply, but allow
upper section of feed tube to remain above material
level.
2.
Adjust load time. See next page for detailed in-
structions on control settings and options.
3.
To allow optimum loading and longest filter life,
adjust load time to fill the loader without over filling.
To identify optimal load time, operate the motor until
material stops moving and note the corresponding fill
Too much air...slow loading
and hose wear more likely
Too little air...plugged
material line is possible
Good mixture of air and
material
Air inlet
4.
Adjust conveying air with
feed tube ring
1.
Assure that the feed tube
is inserted into material
time. This means the loader is OVER FILLED. Sub-
tract 5 seconds from the over-filled time to limit pre-
mature filter blinding.
4.
Rotate the feed tube ring for the best air to material
mixture. The best mixture of air and material will allow
material to flow efficiently, with the right proportion of
conveying air, without clogging and without rapid hose
wear. Be sure material flows into loader consistently
from start to finish, without surging or floating at the
pickup or loader inlet.
8
Need help?
Do you have a question about the GSL Series and is the answer not in the manual?