Xp Master Edition; Ain Screen Elements; Measurement Setup Screen Elements - Noraxon TeleMyo DTS Operating Document

Direct transmission system for surface electromyography
Table of Contents

Advertisement

N.B. If the participant is performing very dynamic movements or is sitting down between
trials, ensure that the probes remain in contact with the participant.

5.2 XP Master Edition

5.2.1Main screen elements
Project is the highest level in the hierarchy of the MyoResearch XP database. This
level can be used to separate different projects or users working in the same version. For
several projects available in one version, you can click the pull-down button to open a list
of all existing projects and change to another Project Directory.
If you are creating a new project, in the Project section in the top left corner, click
New. A dialogue box will open, where you can enter the name of the project. Once you
have written the name of your project in the text box, click OK.
Organize contains all operations needed to manage a Project Directory (Edit,
Copy, Delete). Subjects are the second level in the MyoResearch XP Database System.
Typically, all records (third level) of one person are stored and listed here. To add a new
subject, click New in the Subject section. A dialogue box will open where you can input all
of the subject's information. Once all the necessary information for your study has been
filled out, click OK.
When you want to begin recording EMG, click on Measure on the bottom left
corner of the window, which will bring you to the Measurement Setup.

5.2.2 Measurement Setup screen elements

There are a few different panes in Measurement Setup which are important for
users, namely Muscle/Device Maps, Channels and Application/Configuration.
PC-POD-FA-001-v02
Printed copies are not controlled.
PC-POD-FA-001-v02
Page 15 of 20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents