ABB Relion RES670 Product Manual page 58

Phasor measurement unit (pmu)
Hide thumbs Also See for Relion RES670:
Table of Contents

Advertisement

Phasor measurement unit RES670 2.1 IEC
Secondary system supervision
Table 40. Current circuit supervision CCSSPVC
Function
Operate current
Reset ratio, Operate current
Block current
Reset ratio, Block current
Table 41. Fuse failure supervision FUFSPVC
Function
Operate voltage, zero sequence
Operate current, zero sequence
Operate voltage, negative sequence
Operate current, negative sequence
Operate voltage change level
Operate current change level
Operate phase voltage
Operate phase current
Operate phase dead line voltage
Operate phase dead line current
Operate time, start, 1 ph, at 1 to 0 x U
Reset time, start, 1 ph, at 0 to 1 x U
58
M12358-1 v9
Range or value
(10-200)% of IBase
>90%
(20-500)% of IBase
>90% at (50-500)% of IBase
M16069-1 v11
Range or value
(1-100)% of UBase
(1–100)% of IBase
(1-100)% of UBase
(1–100)% of IBase
(1-100)% of UBase
(1–100)% of IBase
(1-100)% of UBase
(1–100)% of IBase
(1-100)% of UBase
(1–100)% of IBase
Min. = 10 ms
r
Max. = 25 ms
Min. = 15 ms
r
Max. = 30 ms
Accuracy
±10.0% of I
at I ≤ I
r
r
±10.0% of I at I > I
r
±5.0% of I
at I ≤ I
r
r
±5.0% of I at I > I
r
Accuracy
±0.5% of U
r
±0.5% of I
r
±0.5% of U
r
±0.5% of I
r
±10.0% of U
r
±10.0% of I
r
±0.5% of U
r
±0.5% of I
r
±0.5% of U
r
±0.5% of I
r
-
-
1MRK 511 367-BEN D
ABB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents