STANDARD LIQUID/VAPOR RECOVERY PROCEDURE 
1.
Make sure this recovery machine is in good operating condition. 
2.
Make sure all connections are correct and tight. 
3.
Open the liquid port of the storage tank. 
4.
Make sure the MODE valve is set on RECOVER. 
5.
Open the output port of the recovery machine. 
6.
Open the liquid port on your manifold gauge set; opening the liquid port 
will  remove  the  liquid  from  the  system  first.  After  the  liquid  has  been  
removed, open  the manifold vapor port  to finish evacuating the system. 
 
 
 