nstall indoor unit
1. Depending on the position of the unit, the piping may be routed sideway from the
left or the right (Fig 1), or vertically from the back(Fig 2)(depending on the pipe
length of the indoor unit ) . In the case of sideway routing, cut off the outlet cutting
stock of the opposite side.
2. The power cord may be routed separately from the piping. Cut off the outlet cutting
stock and then run the power cord through the hole, keeping the remaining part as
a protection from rodents.
Hole material preparation
1. Remove the mountings and pull the indoor unit pipe out of the housing.
2. Connect the connecting pipe to the indoor unit:
Aim at the pipe center, tighten the Taper nut with fingers, and then tighten the Taper
三 三 ] [ 三 三 三 ;
The size of pipe(mm)
<!>1/4"
<!>3/8"
<P 1/2"
<P5/8"
<!>3/4"
1. Use the insulation sleeve to wrap the joint part
the indoor unit and the connection pipe, and then
use insulating material to pack and seal insulation
pipe, to prevent generation of condensate water on
the joint part.
2. Connect the water outlet with drain pipes, and make
the connection pipe, cables, and the drain hose straight.
3. Use plastic cable ties to wrap the connecting pipes, cables
and drain hose. Run the pipe sloping downward.
Route of Pipeline
Fig 1
Outlet material preparation
Drain pipe connection
�� �!
了 雲
Torque(N• m)
15�25
35�40
45�50
73�78
75�30
Wrap the Piping
\三三
Connectin g Pipe
Drain Hose
an d Cables
芒 - 竺 亡
e
:
la d e
Sp,ooe, £'f;:rTo�"'w, e ocO
Fig 2
P
,p e
g
,,, ,

Advertisement

loading