Ba Ery Installa On; Ii. Ba Ery Installa On - ACL 800 Operation Manual

Megohmmeter
Hide thumbs Also See for 800:
Table of Contents

Advertisement

ACL 880 Digital Resistance Meter

II. Ba ery Installa on

• Ba ery Main Power OFF
• Open Ba ery Cover
• Replace Ba ery (9V Alkaline)
• Close Cover
Figure 5: Main Power Ba ery Cut-Off Switch
on side of Instrument
A. Install test leads or special fi xtures as shown:
1. Slide MAIN POWER Switch to ON
2. "Go A" is the Default Opera on Mode and is displayed when
MAIN POWER is ON
3. To Start Measurement use the Green TEST Pad
a. Press & release TEST Pad
b. Measurement sequence is conducted automa cally; ends
when Green HOLD LED is ON
c. Press MODE to interrupt or clear measurement
4. Data is displayed in the LCD & Hold Indicator LED [Top Panel]
glows green. Press the Yellow MODE bu on once to erase the
data.
NOTE: Press TEST to restart the measurement at any me
B. The MODE bu on performs four useful func ons:
6
Philips #1 screw
Ba ery Cover
Figure 6: ACL 880 Ba ery
Compart-ment on bo om of
Instrument
Figure 7: Test Lead Connec ons:
White = Shield
Black = Current Sensing
Red = Test Voltage
Rev. B / June 2019

Advertisement

Table of Contents
loading

Related Products for ACL 800

Table of Contents