YLINK 1GE+WIFI EPON ONU User Manual page 9

Table of Contents

Advertisement

either end. This may be caused by either too much or too little attenuation over the optical
fiber. Please refer to the Layout Description section of this installation manual for normal
LED activity.
4. Check all signal levels and services on all the ONU communication ports.
Unit Installation Adjustment
Installing the ONU on a horizontal surface (Bench top)
Put the ONU on a clean, flat, sturdy bench top. You must keep the clearance for all sides
of the unit to more than 10cm for heat dissipation.
Installing the ONU on a vertical surface (Hanging on a wall)
You can install the ONU on a vertical surface by using the mounting holes on the bottom
of the ONU chassis and two flat-head wood screws.
a) Insert the screws into the wall. The screw positions must be in the same horizontal line
and the distance between them must be 145mm. Reserved at least 6mm between the
screw caps and the wall.
b) Hang the ONU on the screws through the mounting holes.
1GE+WIFI EPON ONU USER MANUAL
Page 6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1GE+WIFI EPON ONU and is the answer not in the manual?

Table of Contents

Save PDF