Installation - INTEGRA Metering AMBUS Link Mounting And Operating Instructions

Table of Contents

Advertisement

5

Installation

Carefully read the following calls for action and warning information to assure a trouble-
free commissioning.
WARNING
Burns and paralysis resulting in death when touching or grabbing energised system parts.
Life hazard due to electrical shock!
• Perform installation and maintenance work only when the system is
• Safeguarding by external protection elements to assure a safe
• Install a labelled disconnector (fuse) at an accessible location
NOTE
Terminal connections cable cross section
• Terminal connections relay, temperature sensor and M-Bus
• Terminal connections S0 inputs and power supply
AMBUS® Link
off power
Work on and with voltage shall only be performed by authorised spe-
cialists under consideration of applicable regulations
Apply voltage only to the terminals intended
switch-off in case of an error
Use a separate fuse circuit for installation
o Braid up to 2.5 mm
o Torque 0.4 Nm
o Braid up to 6 mm
Torque 1.3 - 1.6 Nm
o
2
2
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMBUS Link and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents