M-Bus Network (Field Level) - INTEGRA Metering AMBUS Link Mounting And Operating Instructions

Table of Contents

Advertisement

5.1.1. Power supply:
5.1.2. Attach the protective covers

5.2 M-Bus network (field level)

In the following the installation of the M-Bus network with AMBUS
ATTENTION
Material damage caused by neglected installation conditions
Danger of malfunction or damage!
AMBUS® Link
Generously dimension the main cable cross section and possibly
divide it into 3 terminal groups
Apply voltage only to the intended terminals
1. Assure that the power cable
is voltage-free!
2. The disconnector needs to be switched
off!
3. Flip up the protective cover
4. Loosen the terminal connection
(terminal 9 (+24V DC) /10 (GND))
5. Connect the power supply  to
terminal 9 (+24V DC) /10 (GND).
6. Tighten the terminal connection
7. Close the protective cover
®
AMBUS
Link is ready for use
1. Attach included protection cover  with
slight pressure
2. Attach included protection cover  with
slight pressure
3. Attach included protection cover  with
slight pressure
The interfaces are protected
®
Link is described
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AMBUS Link and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents