Parameterizing the SITOP UPS1600
6.2 Switching off the UPS when the power fails by a user program
Preconditions
The following preconditions must be fulfilled in order to be able to use function block FB160:
● The library with the function block has been downloaded to the PC.
● The Hardware Support Package (HSP) for the UPS1600 has been installed in STEP 7
● The UPS1600 has been setup for buffer operation (see Chapter Buffering an S7 IO
Installing the "UPS1600 library TIA Portal V12 SP1"
1. Open STEP 7 V12 and change to the project view.
2. Open a global library under task card "Libraries".
30
V12.
controller, including the I/O when the power fails (Page 25)).
The dialog box "Open global library" is opened.
SITOP UPS1600 under STEP 7 V12