Cycle Clutch Pulley Removal (Late); Cord Replacement - IBM Selectric Maintenance Manual

I/o keyboardless printer
Hide thumbs Also See for Selectric:
Table of Contents

Advertisement

3
4
/
5
FIGURE
55.
Carrier and Rocker Removal
CYCLE CLlJTC:llrULLEY REMOVAL (EARLY)
I.
1'"dOI<II tlll!(ycle-Ciutch and Cycle-Shaft removal.
i'.
R,,,"ov,,
tflU"(1I clip from the rotate bellcrank pivot pin
(III, !'iquld6).
:l.
()i·.cIIIIII"cllne rotate link from the rotate bellcrank
(11111
·.flowll).
·1.
1\t:IIIOV" "("clip and remove pivot pin (#2, Figure 56).
:,.
I',,·.h
cloWIl
onthe rotate balance arm (#3, Figure 56)
olld lilt "I'0nthe rotate bellcrank until the two are
.:1,,0101 t:ocnother and then remove the bellcrank.
(,.
IklllC,'''' I 1\1) cycle-clutch-latch spring (not shown).
/.
1\"/1",'1"
th0~ottom
latch screw, loosen the top latch
' •• ;1,,1'1
UIlt!
slide the latch up and out (#4, Figure 56).
B.
rll!;"
111l'
hallaH the pulley and remove the pulley (#5,
I' i
'illl"
:i(').
'1.
Th" foll'lI'Iing adjustments should be checked after the
cycle-cllJtcnpulley is replaced.
(J.
Lui
eli height
h.
Cycldaft end play
FIGUREl6. Cycle Clutch Pulley Removal
3-15
c.
Idler gears
d.
Cycle-clutch spring
e.
Cycle-clutch latch bite
f.
Damper-spring
g.
Filter shaft timing
h.
Print shaft timing
i.
eland C2 contact timing
CYCLE CLUTCH PULLEY REMOVAL (LATE)
1.
Perform the Cycle-Clutch and Cycle-Shaft removal.
2 .
Remove be I t from pu II ey •
3.
Remove two set screws from pulley. One on top of the
other used as a lock screw.
4.
Remove cycle clutch hub from pulley.
5.
Perform section
9
of early style cycle clutch removal.
CORD REPLACEMENT
NOTE:
Remove the main spring.
1.
With the carrier to the extreme right, feed the carrier re-
turn cord around the pu lIeys and connect to cord drum
(#
I,
Figure 62) •
2.
Connect carrier return cord to carrier using long nose
pliers and spring hook .(#2, Figure 62).
3.
Disconnect clutch unlatching link (#1, Figure 63).
4.
Manually latch the clutch and turn the machine by hand
unti I the carrier is pu lied fully to the left.
5.
Connect the escapement cord to the drum with about 1
turn of the cord on the drum (#2, Figure 63).
6.
Connect tlie end of the cord to the carrier and then place
it on the pulleys (#3, Figure 63).
7.
Connect the clutch unlatching link.
8.
Replace and adjust the main spring (5 turns) with the car-
rier resting at the extreme RH margin.
CORD ADJUSTMENT
A time saving method of transport card adjustment may be ac-
complished by tying a knot in the end of the cord as close to
the hook as possible.
2
o
=-=-.=-~_
o
-
-
-
-
-
-
,I,
.----,
-
- ' - - -
-~-_--'II'--"r-l
-
-,
1-'""""""7/.~
~
,). -..L -:--'
(
"
--
C-v
FIGURE 57. Carrier Return Cord Replacement
FI GU RE 58.
Escapement Cord Replacement