Download Print this page

Nexsan Unity Storage 316 Quick Start Manual

Expansion
Hide thumbs Also See for Unity Storage 316:

Advertisement

Quick Links

NEXSAN
Unity Storage 316 Expansion
Quick Start Guide
This document provides installation steps to rack, cable, and power on a Unity Storage 316 Expansion.
For additional documentation please visit
Taking delivery
Check to ensure that no damage has been sustained
to the packaging in transit. If any of the Unity
Storage 316 components appear damaged, please
contact your reseller immediately.
Item
Name
1
LAN port
2
Status LED
3
Unit ID status LED
4
BMC Reset button
5
SAS IN ports
6
SAS OUT ports
7
SAS link status LEDs (2 IN, 2x OUT)
Prepare for installation
Carefully read the safety notices on
A
Ensure ahead of time that you have a suitable
B
rack; see
Rack and enclosure specifications
page
4.
Ensure that you have a Phillips screwdriver.
C
http://helper.nexsansupport.com/unt_support.html
Front view (bezel removed)
Rear view controller I/O components.
page
4.
on
1 — Unity Storage 316 Expansion Quick Start Guide
Hardware overview
Here are some of the key components of the US 316
Expansion:
Description
Not used with Unity Storage Expansions
Green: Initialization successful
Red: Initialization failure
On/Off
Resets the base management controller
Serial Attached SCSI IN ports from the head unit
SAS OUT ports to another storage unit
Green: All four physical layers (PHY) of each
port connected with consistent link speed (12 G
or 6G)
Red: Single PHY degraded link speed or
disconnected
Arrange for someone to assist you during
D
installation.
CAUTION:
Acclimate new disk drives to
room temperature for two hours before you
install them.
Firmware Version 5.1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Unity Storage 316 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nexsan Unity Storage 316

  • Page 1 NEXSAN Unity Storage 316 Expansion Quick Start Guide Firmware Version 5.1 This document provides installation steps to rack, cable, and power on a Unity Storage 316 Expansion. For additional documentation please visit http://helper.nexsansupport.com/unt_support.html Taking delivery Hardware overview Check to ensure that no damage has been sustained Here are some of the key components of the US 316 to the packaging in transit.
  • Page 2 Unpack the US 316 Step 3: Install the inner rails on the chassis  (if necessary) Remove all the components from packaging. Extend the inner rail toward the front of the rail Position hands under the chassis to pull it free assembly as far as possible, then depress the from the foam insert.
  • Page 3 LEDs. These LEDs provide you with critical information related to the corresponding node. If the Fan fail LED or Power fail LED illuminates, replace the component as described in the Nexsan Unity Storage Expansion Reference Guide. Drive carrier LEDs Each drive carrier on the US 316 Expansion has two LEDs.
  • Page 4: Safety Notices

    CLI Reference Guide Copyright © 2010-2018 Nexsan Corporation. All Rights Reserved. Nexsan®, Unity 2200™, Unity 4400™, Unity 6900™, Unity 2200X™, US 224™, US 316™, US 424™, US 460,™, FASTier™, and the Nexsan logo are trademarks or registered trademarks of Nexsan Corporation. All other trademarks and registered trademarks are the property of their respective owners.