Step 6
Reinstall the front panel for the DCPS.
3.4
Installing a Ground Cable
Install a subrack ground cable into the rack by using M6x16 screws. Figure 21 shows the subrack ground
terminals.
3.5
(Optional) Installing Dry Contact Signal Cables
Procedure
Step 1
Press the contact plate using a flat-head screwdriver to flip the metal spring inside each dry
contact.
Step 2
Connect the signal cables to the corresponding dry contacts.
Step 3
Put away the flat-head screwdriver and check that the signal cables are securely connected.
(1) Contact Plate
Figure 21 – Subrack Ground Terminals
(1) Subrack Ground Terminals
Figure 22 – Installing a Dry Contact Signal Cable
(2) Dry Contact