Condensate Piping - Dunkirk DCBF-125 Installation, Operation & Maintenance Manual

Condensing gas fired
Hide thumbs Also See for DCBF-125:
Table of Contents

Advertisement

FIGURE 5-26 - Condensate Drain
Do not glue cap
on if used for
dust protection.
End must be left
open
3/4 " PVC
Do not place in
environment with
temperatures
below freezing.
Condensate
outlet will block
if condensate
freezes.
5 - COMBUSTION AIR AND VENT PIPING

5.11 Condensate Piping

• Use materials acceptable to authority having jurisdiction. In
absence of such authority:
• USA - PVC or CPVC per ASTM D1785/D2845 Cement or
primer per ASME D2564 or F493.
• No external trap needed.
• Connect condensate hose, hose clamps, and coupling to
boiler drain trap as shown in figure 5-28.
• Connect condensate piping to 3/4" PVC for 125/150 as
shown.
• Slope condensate drain pipe minimum 1/4" per foot
(21 mm/m) away from boiler.
• Support condensate pipe to eliminate any sages.
• Use field source condensate pump, designated for use with
condensing boiler, if boiler located below disposal point.
• Condensate pump should have overflow switch.
Condensate from Boiler is slightly acidic and may cause
property damage if overflow.
• Field source condensate neutralizing kit as required
by authority having jurisdiction or for environmentally
friendly condensate disposal.
Manufacturer requires an air vent be used to prevent
condensate line vacuum lock.
23
NOTICE
240012564 REV A, [05/15/2019]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dccf-150

Table of Contents