Page 2
It is recommended that the wiring is to be done by a professional, and the device must be connected to the ground. SBTL5000 installation holes and cabling positions as shown in Figure 1-1: Figure 1-1 SBTL5000 series installation guide 1...
4. Turn on the air switch to test whether the device is working properly, wait for 10 seconds for the gate to complete self-test program. At the same time check whether or not the indicator light working properly. If everything is normal, you 2 SBTL5000 series installation guide...
4.1 Function of control board A. After connecting to power, the LCD screen on control board will displays default state, which is current Work Mode. B. There are 4 buttons ‘UP, DOWN, ENT, ESC’ below the LCD screen. SBTL5000 series installation guide 3...
It is also must to check the system again after installing in the field. All the above operation should be operated by professional and parameters setting of the system shouldn’t be changed without permission. 4 SBTL5000 series installation guide...
When power on, the swing Ensure that no obstacle in the arm can not turn back to the passway, then restart the initial position. equipment. SBTL5000 series installation guide 5...
Need help?
Do you have a question about the SBTL5000 series and is the answer not in the manual?
Questions and answers