Central Payment (2B) - Electrolux W3 Series Installation Manual

Washer extractor
Hide thumbs Also See for W3 Series:
Table of Contents

Advertisement

Installation manual
34
8.4.2

Central payment (2B)

To start the machine from a central payment system, the payment system must transmit a start pulse to the machine.
The start pulse can be either 230V or 24V. In order to receive a feedback signal once the machine has started, 230V
or 24V must be connected to connection 19. The feedback signal on connection 18 remains active (high) during the
entire program.
fig.6316A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

W575nW585nW5105nW5130nW5180nW5250n ... Show all

Table of Contents