Job#_______________Model#___________________Ser#__________________ Date_______
1. Check all wire connections for tightness: OK? □
2. Verify correct voltage
Voltage = ________VAC
3. Verify water flow rates
Evap. Flow________gpm
4. Run unit at 100% capacity for a minimum of 15 min.
5. Supply (condenser) water temp. in (Tcondin)__________°F
6. Supply (condenser) water temp. out (Tcondout)__________°F
7. Heating Capacity__________btuh
Heating Capacity = (Tcondout – Tcondin) X Cond. Flow X 500
Source (evaporator) water temp. in (Tevapin)__________°F
8.
Source (evaporator) water temp. out (Tevapout)__________°F
9.
10. Compressor amps per phase
Ph1__________ amps Ph2 __________amps Ph3 __________amps
11. Superheat measured prior to accumulator ________°F
12. Sightglass circuit 1:
13. Evaporator Pressure _____________psig
Saturated Evaporator Temperature (SET)______°F
14. Condenser Pressure _____________psig
Saturated Condenser Temperature (SCT)________°F
15. Compressor Discharge Line Temperature ________°F
16. Refrigerant Liquid Line Temperature ________°F
17. Oil Level Sight Glass compressor
18. Approach Temperature (SCT – Tcondout )___________ °F
Signature________________________
28
Start Up Check List
Cond. Flow________gpm
Clear? □ Bubbles? □
Full□ ¾□ ½□ ¼□
Print Name___________________________
OK? □
(Only applicable to Water Source Units)
(Only applicable to Water Source Units)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geyser c seriesC250wC60wC90wC125wC185w

Table of Contents