Hisense HZX-4.0AEC Operation Installation Maintenance Manual page 27

Ahu connection kit, expansion valve box, control box
Table of Contents

Advertisement

Input / Output Setting
HIGH
COOL
A/C
SERVICE
Table B Input and Output Number Indications / Terminals / factory-setting
number
Indication
Input1
Input2
Output1
Output2
Output3
NOTES:
* After at least 3 minutes from the power ON, change the optional setting.
* Record the setting conditions for each input and output in the "Setting" column of the table.
Table C Input and Output Settings and Indications
n I
d
c i
t a
o i
n
2
00
N
t o
S
01
Control by Field-Supplied Room Thermostat (Cooling)
02
Control by Field-Supplied Room Thermostat (Heating)
03
Remote Control ON/OFF Function 1
04
Remote Control ON/OFF Function 2 (Operation)
05
Remote Control ON/OFF Function 2 (Stop)
06
Cancellation of Commands from Remote Control
Switch after Forced Stoppage
07
Cooling or Heating Operation Mode Setting
08
(Not Available)
1
2
Remarks
1
Terminals
,COM
,COM
,COM
,COM
,COM
I
n
p
t u
t e
Setting When Shipping
Remote Control ON/OFF Function 1
Cancellation of Commands from Remote
Control Switch after Forced Stoppage
O
p
r e
t a
o i
n
S
g i
n
l a
l A
r a
m
S
g i
n
l a
Thermo-ON Signal during Heating
N
t o
Operation Signal
Alarm Signal
Cooling Operation Signal
Thermo-ON Signal during Cooling
Heating
Thermo-ON Signal during Heating
(Not Available)
Defrost signal
Indication
O
u
p t
t u
S
t e
Operation
Signal
2
03
06
0
1
0
2
06
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hzx-2.0aecHzx-6.0aecHzx-10.0aecHzx-30.0aecHzx-20.0aec

Table of Contents