A.O. Smith ST-300 User And Service Manual page 30

Storage tank
Table of Contents

Advertisement

Available languages

Available languages

2.2.2
2.2.3
30
ST 300
Hot Water side
See (B) in the installation diagram (2.1 "Installation diagram").
Note
Insulating long hot water pipes prevents unnecessary energy loss.
1. Optional: fit a temperature gauge (12) so you can check the temperature of the
tap water.
2. Fit the T&P valve (3).
3. Fit a stop valve (11) in the hot water outlet pipe for servicing.
Circulation pipe
See (C) in the installation diagram (2.1 "Installation diagram").
If an immediate flow of hot water is required at draw-off points, a circulation pump
can be installed. This improves comfort, and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance of
the circulation system.
2. Fit a non-return valve (5) after the circulation pump to guarantee the direction of
circulation.
3. Fit two stop valves for servicing (4).
4. Connect the circulation pipe according to the installation diagram (2.1 "Installation
diagram").
Installation, Service and User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

St seriesSt 300

Table of Contents