Download Print this page

OLT S124D Assembly Manual page 6

12x4 slider lean-to storage shed

Advertisement

3.
Position 1C - Floor Runners on completed floor frame so runners are
flush but not overhanging. Attach with 4 - 2 1/2" Screws per runner. There
are 7 floor runners in total.
4.
Complete remaining floor runners as shown above. With Floor Runners attached, carefully flip the floor
over and place on your foundation. Caution - Be careful when laying floor down not to bend or twist floor.
Note: Having a level foundation is critical. Choosing a foundation will vary between regions. Typical
foundations can be concrete pads or patio stones positioned underneath the floor runners.
5.
Position 1D - Plywood Floor on top of completed floor frames.
Plywood will sit slightly inset from outside of floor frame.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 6
Parts (Steps 3 - 4)
1C - Floor Runners
(1 1/2" x 3 1/2" x 45 1/2") x 7
Hardware (Steps 3 - 4)
S1 - 2 1/2" Screws x 28 total
Concrete Slab
Foundation
Note: Plywood is cut slightly
smaller than floor framing.
Keep plywood seams tight.
Parts
1D - Plywood Floor
(5/8" x 45 3/8" x 70 5/8") x 2
sales@outdoorlivingtoday.com

Advertisement

loading