Download Print this page

OLT S124D Assembly Manual page 14

12x4 slider lean-to storage shed

Advertisement

22.
Attach 2I & 2J - Horizontal Wall Cleats to Wall Extender bot-
tom framing and Rear Wall top framing so that cleat is flush with
extender framing. There are two short cleats and one long cleat.
Alternate alignment of screws, so half screw into Wall Extender
Framing and half into Rear Wall Top Framing. Use 3 - 1 1/4" Screws
per short cleat and 6 - 1 1/4" Screws on the long cleat.
23.
To complete Wall Section, attach bottom 2x3 wall plates to plywood floor with
2 - 2 1/2" Screws per wall section. Confirm Doorway opening is 66 1/2" wide. Prior to
securing, make sure wall panels are aligned correctly on the floor. Refer to Step 9. Wall
siding should overhang floor while 2x3 wall plates should sit flush with floor.
Toll Free 1-888-658-1658
Optional - Caulking seams will help
prevent moisture from entering at
seam. Caulking not included in kit.
Confirm Doorway opening is
66 1/2" wide at top and bottom.
www.outdoorlivingtoday.com
Pilot
Hole first.
Page 14
Parts
2I - Horizontal Wall Cleat - Long
(3/4" x 3 1/2" x 84") x 1
2J - Horizontal Wall Cleats - Short
(3/4" x 3 1/2" x 26 1/4") x 2
Hardware
S2 - 1 1/4" Screws x 12 total
S1 - 2 1/2" Screws
sales@outdoorlivingtoday.com
Hardware
x 28 total

Advertisement

loading