Maintenance
28
S&C Instruction Sheet 658-500
Physical Inspection
Enclosure
□
Perform general cleaning of enclosure and surrounding area.
□
Perform tightness checks of electrical connections.
□
Inspect all latching mechanisms.
□
Check gaskets and seals around all access doors and the enclosure.
Controls
□
Check control boards for build-up of particulate and/or fungal growth. Clean with
electronics spray cleaner/degreaser, if necessary.
□
Verify door alarm functionality.
□
Verify the DC power supply voltage levels (adjust if necessary).
□
Review the event log for trends or possible malfunctions.
Maintenance Completion
□
Verify that any damaged or inoperable components have been repaired or replaced.
□
Verify that all applicable maintenance tasks are complete.
□
Address and/or report any concerns the site facilitator may have.
□
Place the PureWave CES System in the desired control mode and state. Record
these below:
Control Mode (current switch position): ____________________
System State: ____________________
□
Close and padlock all access doors.
Annual Maintenance Performed By: _________________________
Date: _____________