Maintenance
28
S&C Instruction Sheet 658-500
Physical Inspection
Enclosure
Perform general cleaning of enclosure and surrounding area.
Perform tightness checks of electrical connections.
Inspect all latching mechanisms.
Check gaskets and seals around all access doors and the enclosure.
Controls
Check control boards for build-up of particulate and/or fungal growth. Clean with
electronics spray cleaner/degreaser, if necessary.
Verify door alarm functionality.
Verify the DC power supply voltage levels (adjust if necessary).
Review the event log for trends or possible malfunctions.
Maintenance Completion
Verify that any damaged or inoperable components have been repaired or replaced.
Verify that all applicable maintenance tasks are complete.
Address and/or report any concerns the site facilitator may have.
Place the PureWave CES System in the desired control mode and state. Record
these below:
Control Mode (current switch position): ____________________
System State: ____________________
Close and padlock all access doors.
Annual Maintenance Performed By: _________________________
Date: _____________