UNPACKING & INSTALLATION
Installing MEK Reservoir
3. Connect the flow line coming from the
rubbing block to the flow valve located on the
bottom of the reservoir as shown
4. Tighten the fitting by hand then use a
10mm wrench tighten an additional ¼ turn.
Excessive tightening may collapse the ferrell
and restrict the solvent flow.
5. Connect the air supply line from the
machine base to the back of the reservoir
assembly.
8
Need help?
Do you have a question about the MEK RUB TEST MACHINE and is the answer not in the manual?