Download Print this page

ION FireFly Quick Reference Manual page 7

Field operations

Advertisement

Figure 1-1. Equipment Layout Example
TASK: Lay Out Equipment
1.
Locate station equipment.
Use NavTool to locate the equipment drop point and move equipment to the closest station location.
2.
Unload equipment.
• Unload the first set of the FireFly equipment.
• Attach the antenna to the antenna mount.
• Plug the VectorSeis cable into the FSU-2E.
• Plug the external battery into the FSU-2E as shown and swipe the magnet over the FSU-2E power symbol to turn on the FSU-2E.
FireFly Field Operations Quick Reference Guide
7

Advertisement

loading