Download Print this page

ION FireFly Quick Reference Manual page 17

Field operations

Advertisement

Pick up the equipment.
3.
• Retrieve VectorSeis sensor, using extraction tool if necessary.
• Disconnect the external battery from the FSU-2E.
• Disconnect the VectorSeis sensor from the FSU-2E.
• Gather the FSU-2E, VectorSeis sensor, and external battery.
To prevent potential problems, disconnect the battery from the FSU-2E before disconnecting the VectorSeis Sensor from the
Caution
FSU-2E.
Navigate to next position and repeat step 2 and 3.
4.
5.
Move to the last station.
• Ensure that all ground assembly equipment has been collected.
• Secure the equipment at equipment pickup point for pickup by helicopter or vehicle.
• Use NavTool to take GPS reading for the equipment pickup point.
6.
Use NavTool to select next set of stations in the field and repeat step 1 to step 5.
FireFly Field Operations Quick Reference Guide
17

Advertisement

loading