Download Print this page

ION FireFly Quick Reference Manual page 10

Field operations

Advertisement

a. Select the FSU-2E that you are connecting to.
b. After the NavTool runs FSU-2E tests, transmit the data to the FSU-2E.
c. Take a GPS and Compass reading with NavTool and transmit the readings to FSU-2E.
5.
Move to the next station.
• Pick up equipment and drill and move to the next station.
• Navigate to the next location using NavTool.
Unload equipment.
6.
• Unload the next set of FireFly equipment (FSU-2E, VectorSeis unit, and external battery) and place the units at the station
location.
• Plug the VectorSeis sensor cable, the antenna, and the external battery into the FSU-2E. Wait 30 seconds after plugging battery
into the FSU-2E to place the FSU-2E and VectorSeis sensor.
Connect the components in this order:
Note
Sensor, Antenna, Power battery (SAP)
7.
Repeat step 3 and step 4 for all remaining stations.
8.
Move to final station.
• Secure the empty equipment at the final station in the set.
• Use NavTool to take the GPS reading for the empty equipment drop point position.
Use NavTool to select the next equipment drop point in the field and repeat step 1 to step 9.
9.
FireFly Field Operations Quick Reference Guide
10

Advertisement

loading