5.5 Cabling

The laid 2-core cable is installed for the electrical connection of the TS120 impact sprinkler.
The cable is pulled through the right or left opening on the bottom of the housing into the
cable compartment.
Possible location
for pulling in the control cable
into the sprinkler
The DBR/Y-6 cable connector kit (article no.:
ZH90032) for connecting the control cable to the
coil fitted inside the sprinkler.
Open the cover of the cable compartment and
connect the solenoid cable. Please use the DBR/Y-6
connector kit for the connection.