Download Print this page

Arrow Storage Products AT101 Owner's Manual & Assembly Instructions page 6

Universal attic kit

Advertisement

Horizontal Siding Buildings
TQ06
If you are installing the Attic Kit in a Horizontal Siding building, drilling of the siding with a 1/4" diameter
drill will be necessary if building is already assembled. If there are no holes in the framework, drilling will
be required. Start your fi rst hole approximately 9" from the corner of building and your next hole at 26 3/8"
toward the front of building.
In all cases use bolts and nuts at the upper frames as shown. Position tab on end of post on the inside of
the upper frame. Depending on the style of your building, fasten bottom of posts as shown.
When mid wall frames are offset from siding, reverse the bottom post so that the tab is on the inside, oppo-
site the upper tab. Fasten tab to mid wall frame using a bolt and nut.
UPPER FRA-
ME
POST
INSIDE BUILDING
REVERSE POST
MID WALL BRACE
FOR BUILDINGS WITH NO MID WALL FRAME: Te-
lescope posts to line up tab on bottom post with fl at
spot in siding panel. Fasten posts together with a bolt
and nut. Using hole in bottom tab as a guide, drill 1/4"
diameter hole through siding panel and fasten using a
bolt and nut.
6
IF BUILDING IS ALREADY ASSEMBLED
DRILL SIDING
1/4" (0,6 cm) DIA DRILL
SIDING
UPPER
FRAME
POST
INSIDE BUILDING
POST
MID WALL FRAME
DRILL SIDING
1/4" (0,6 cm) DIA. DRILL
SIDING

Advertisement

loading