Set Up/Installation; For Ground Set Up - Conel Flow Box Installation And Operation Instruction Manual

Lifting unit for waste water
Table of Contents

Advertisement

Available languages

Available languages

ATTENTION! The relevant standards must be observed!
For use below the backwash level:
>
Guide the discharge line with a loop above the backwash level.
>
If the base of the discharge line loop is more than 5 m above the lifting unit, an
additional check valve must be installed.
>
Provide shut off valves.
>
Every drain must be fitted with an odour trap.
Also see the installation examples in the Appendix, fig. 3.
ATTENTION!
>
The set up must be made frost-free and on level ground.
>
Adhere the supplied rubber feet into the marks on the underside of the tank.
>
Remove the tank cover (release the snap connections on the front, without
stretching them too much).
>
Discharge line connection to the right, modification to the left is possible as follows:
Modification of discharge line connection
1. Remove the upper left stopper and seal ring.
2. Pull off the discharge line inward.
3. Remove the pump complete with switch from above, turn by 180° and attach it
again in the tank in the intended retainer.
4. Push the discharge connection into the upper left opening.
5. Use the seal ring and stopper to close off the right upper opening.

10. Set up/installation

10.1 For ground set up

33
Set up/installation | For ground set up

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flow Box and is the answer not in the manual?

Table of Contents