Mitsubishi Electric CITY MULTI PVFY-P12NAMU-E Technical & Service Manual page 32

R410a
Table of Contents

Advertisement

[ VIII Troubleshooting ]
Symptom
Valve closure fail-
To check the LEV on the indoor unit, check the indoor unit liquid pipe temperature
ure (leaky valve)
that appears on the operation monitor on the outdoor unit's multi control board while
operating the indoor unit in question in the FAN mode and the other indoor units in
the cooling mode.
Normally, the LEV is fully closed while the unit is in the FAN mode. If the valve is
leaky, liquid pipe thermistor reading will be lower than normal. If it is significantly
lower than the inlet temperature on the remote controller, valve closure failure is
suspected. If the amount of leakage is insignificant, replacement of LEV is unnec-
essary unless it is causing a problem.
Misconnections of
Perform a visual check for disconnected connectors.
connectors or con-
Perform a visual check of lead wire color.
tact failure
HWE1405A
Checking Criteria
(A)
Termistor (TH22)
(A)
LEV
- 25 -
Remedy
Replace the LEV
if the amount of
leakage is great.
Disconnect the
connectors on
the control board
and perform a
continuity test.
GB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents