Bottom Bracket Installation; Figure 4. Wall Mount Detail - Industrial Climate Engineering SlimPac ECUA12 Installation & Operation Manual

Vertical air conditioners
Table of Contents

Advertisement

Protection Association Standards 90A and 90B before designing and installing duct work. The duct
system must be engineered to ensure sufficient air flow through the unit to prevent over-heating of the
heater element. This includes proper supply duct sizing, sufficient quantity of supply registers, adequate
return and filter area. Ductwork must be of correct material and must be properly insulated. Ductwork
must be firmly attached, secured and sealed to prevent air leakage. Do not use duct liner on inside of
supply duct within 4 feet of the unit.
Galvanized metal duct extensions should be used to simplify connections to duct work and grilles. Use
fabric boots to prevent the transmission of vibration through the duct system. The fabric must be U.L.
rated (UL-181) to a minimum of 197°F.
2.6

Bottom Bracket Installation

Wall Openings
Measure the dimensions of the supply and return ports on the SlimPac™ ECUA.
Cut openings in the enclosure wall for the supply and return ducts. Make the supply openings one inch
larger than the duct flanges on the unit. The one inch clearance must be maintained on all sides of the
supply duct to combustible material for the first three feet of the duct.
1. Remove and discard the shipping crate attached to the unit.
2. The SlimPac™ ECUA is shipped with the bottom brackets easily removed.
3. Refer to Figure 3. Attach the bottom support bracket to the wall using appropriate hardware.
Figure 4. Wall Mounting Detail
17
ICE SlimPac ECUA12-18 I&O Manual 03/2019 Rev.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slimpac ecua18

Table of Contents