Download Print this page

GE Tetra 24/24 Installation Manual page 3

Advertisement

Installation
Sign
LED modules mounted to sides
1
Turn off power and remove panel from the sign.
4-3/8 in. (111 mm)
3
Drill two mounting holes inside the sign.
White to white
or blue
Green to
green
AC line
5
Using UL certified wire connectors, connect the
red lead (Input +) of the 24/24 Module to the red
lead (DC +) of the power supply, and the black lead
(Input -) of the 24/24 Module to the black or blue
lead (DC -) of the power supply.
1-3/8 in. (34.9 mm)
Black to black
or brown
LED driver
Black or blue (-)
LED driver
LED driver
2
If installing multiple 24/24 Modules or LED drivers
in the same compartment, keep them at least
2" (50.8mm) apart end to end and 4" (101.6mm)
apart along the sides.
NOTE: All drivers except GEPS24-180U must
be installed in a raceway or be provided with a
GEPSJB60 LED driver extended enclosure.
4
Use rivets or screws to secure the 24/24 Module
within the sign.
Red (+)
Red stripe (+)
24/24 Module
White (-)
6
Using UL certified wire connectors, connect the
red-white lead (Output +) of the 24/24 Module to
the (+) supply lead of the Tetra LED modules, and
the white lead (Output -) of the 24/24 Module to
the (-) supply lead of the Tetra LED modules.
3
LED driver
4"
LED driver
2"
To LED modules
Inline connector

Advertisement

loading