Supra TRAC-Vault BT Installation Instructions page 2

Surface mount

Advertisement

2
down) and insert each mounting screw all the way
through the mounting holes in the vault, with the
chain mounting bracket in the lower left hole.
7. Tighten all 4 screw heads in the order shown in
Figure 1 until they are flush with the back of the
vault, and behind the vault lip.
8. Using the appropriate driver, drive all 4 screws into
the wall a little at a time until all 4 screws are driven
completely in and the vault is tight against the wall.
To install the TRAC-Vault BT through the wall:
1. Before drilling, ensure that no interference will
occur with any plumbing, electrical, fire or security
systems, etc.
2. Once the location for the unit has been decided,
level the template on the wall and punch or mark the
holes for drilling (see Figure 1).
3. Using the correct bit for the type of wall, drill
sufficiently large holes to accommodate the 5/16"
all-thread rod.
4. Insert a lock washer and a nut on three of the four
all-thread rods. On the fourth, install a lock washer,
the chain mounting bracket, and then the nut. It is
important that the end of all-thread rod is flush with
the nut.
5. Put the Vault up to the wall (drain hole down)
and insert two all-thread rods through the top two
mounting holes. Insert the all-thread rod that you
have attached the chain mounting bracket to through
the lower left hole. Insert the last all-thread rod into
the bottom right hole. (See Figure 5.)
6. On the other side of the wall, mount the interior
cover plate (optional) onto the all-thread rods. Put
a 5/16" fender washer, and a 5/16" lock washer on
Figure 5. Side view, TRAC-Vault BT installed through the wall
TRAC-Lid BT
Lid chain
attachment
Lock washer
Nut
TRAC-Vault
Vault
chain bracket
Drain hole
Figure 3. Optional Tamper Switch
Figure 4. Installed TRAC-Lid
TRAC-Vault
Indicator
light
TRAC-Lid BT
Thumb lever
Wall
Back plate
All-thread rod
Nut
Lock nut
Fender washer