Verify The Epowerswitch Operation - Belkin ePowerSwitch F1D001 User Manual

Belkin epowerswitch user manual
Table of Contents

Advertisement

24

Verify The ePowerSwitch Operation

1. After you complete all configuration settings and connect the
ePowerSwitch System to the network, check the LINK status.
Power and Link lights should be on all the times. Collision
light turns on occasionally.
2. PING the ePowerSwitch System. Issue a PING command
from the NMS (Network Management Station).
a) If you do not get a response, check the card 's
network connection and IP address.
3. Test the adapter with an NMS. Perform a "get" and a
"set."
a) If the get or set commands fail, check the
ePowerSwitch System access controls. The manager
must have read permission to execute a get
command successfully and read/write permission to
execute a set command successfully.
(See Configuring the NMS section for a detailed discussion.)
Your ePowerSwitch is now installed and
24
completely functional.

Advertisement

Table of Contents
loading

Table of Contents