Step 6 - Connect Controller Signals
Connect per site engineering instructions.
Pulsar Plus - Connect to J2, J3, J4, and J5.
See Information Controller Connections & Information Battery Connections.
Step 7 –Installation of Power Modules (Rectifier / Converter)
Universal Power Shelves accept rectifier and converters in any slot
Caution:
The power unit latch is not a carrying handle.
1. Slide the power unit into the power slot approximately ¾ of the way.
2. Open the faceplate by sliding the latch to the left until the faceplate releases and swings outward.
3. Slide the power unit into the slot until it engages with the back of the shelf. Swing the faceplate closed to fully
seat the unit. Verify the faceplate is latched.
4. Correct insertion of the power unit will automatically add the unit to the controllers' inventory of units.
1,
To remove a rectifier / converter:
A. Open latch fully to release and remove.
B. Enter Inventory section of controller and remove hardware to clear alarm.
Step 8 – Initial Startup
Verify that all AC, DC and Controller connections are complete and secure. Turn on AC input breakers. If there are no
alarms, make required adjustments to the default settings on the controller for this installation.
Step 9 - Configure Controller
Verify and edit controller basic configuration parameters per site engineering instructions.
Refer to Galaxy Pulsar Plus Product Manual for additional information.
Information: Controller Default Voltage Settings
Parameter
Rectifier Float Selective High Voltage Shutdown
High Float Voltage Major Alarm
High Float Voltage Minor Alarm
Rectifier/System Float Voltage
Battery on Discharge Float Alarm
Very Low Float Voltage Alarm
Rectifier On Threshold
2.
-50 to -60V
-50 to -60V
-50 to -60V
-42 to -56.5V
-46 to -55V
-40 to -51V
-40 to -51V
Infinity S (NE-S) Dual Voltage Power System – Quick Start Guide
Document 8600243957P Rev 2 Jan 2019
3.
Range
Valve-Reg (Default)
58.50
57.00
56.00
54.48
51.00
46.00
44.00
Flooded
NiCd
58.50
58.50
57.00
57.00
56.00
56.00
52.08
54.40
50.00
51.00
46.00
46.00
44.00
44.00
5

Advertisement