Page 1
Installation Guide Concentric thermostatic mixing valve WG-179M-CP This instruction booklet covers these models: WG-179M-CP. Vado Wedmore Road, Cheddar, Somerset, England BS27 3EB tel 01934 744466. fax 01934 744345 aftersales @ vado.com www.vado.com Keep for future reference Version 1, 1-8-17...
Page 2
Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for future FIXING KIT BOX reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Page 4
Installation - Quick guide Installation Prepare the wall with 2 copper pipes Fig. 1 at 147-153mm centres. Make sure the pipes are level (Fig. 1). Connect the water supply to the inlet pipes. The hot water should be connected to the left hand pipe . Before installing your new mixer, flush through the pipe work to ensure removal of debris, turn off the water...
Page 5
Installation Installation From the underside tighten both grub Mounting plate 15mm copper screws to secure the valve in position. pipe Cover 15mm copper pipe Olive Cover Hex key Cold Shower hose Olive Place a rubber washer into the nut end of the hose and attach it to the valve outlet.
Page 6
Commissioning Notes: The valve has been factory set under Fig. 1 balance pressures and hot water supply at 65°C. When your specific operating conditions Temperature are significantly different from above, the control temperature of the water may vary from the handle setting.
Need help?
Do you have a question about the WG-179M-CP and is the answer not in the manual?
Questions and answers