K5 Trouble Shooting Guide - Quick Start Parameter Guide
1.) Check tubing connections to ensure correct installation set up.
2.) Check to ensure collet colors are in the correct configuration.
3.) Check to ensure jack screw is in the "up" position unless an air charge tank is being used.
4.) Ensure there is a minimum feed pressure of 35 psi.
5.) Ensure a full 3/8 inlet valve is used.
6.) Ensure system has been sanitized and air is purged from the system.
7.) Check TDS vs. feed pressure. Ensure there is a minimum of 20 psi above osmotic pressure.
TDS
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
* System working pressure must be 20 psi greater than the osmotic pressure
** System must meet a minimum feed pressure of 35 psi
100 ppm TDS = 1 psi of osmotic pressure
1000 ppm TDS = 10 psi osmotic pressure
Kinetico Incorporated  10845 Kinsman Road, Newbury, OH 44065  440/564-9111  Product No. 14337  Revision 12/2010
Osmotic pressure
Minimum feed pressure required
2.5
5
7.5
10
12.5
15
17.5
20
22.5
25
27.5
30
35
35
35
35
35
35
37.5
40
42.5
45
47.5
50
Page 2 of 7
K5 Drinking Water Station
Trouble Shooting Guide
Working pressure
32.5
30
27.5
25
22.5
20
20
20
20
20
20
20

Advertisement