Adjustment Of The Synchronizer - Mitsubishi PLK-E1010 Technical Manual

Electronic pattern sewing machine
Table of Contents

Advertisement

(2) Fully turn the crank (No.3) of the rotary solenoid (No.2) in the arrow direction. At this time,
adjust the upper thread tension release for the discs to be opened 0.8 to 1.0mm.
(3) For this adjustment, loosen the nut
becomes wider and if loosen the nut
(4) If the normal opening of the discs can not be obtained with the nut adjustment, loosen the
wire fix screws (No.5) and adjust the tension of the wire (No.6).
(5) The wire (No.6) may be got longer over a long period machine operation. At that time, adjust
the upper thread tension release again.
0.8~1.0mm

7-18. Adjustment of the synchronizer

[NOTE] (a) When the sewing is finished, the arm timing mark
mark
the running. This is the normal condition.
(b) If theses timing mark
adjust the timing mark matching.
Hold the sewing machine pulley (No.1) by hand and insert the angle adjuster (No.2) into the
hole
C
then, turn the angle adjuster (No.2).If turn the angle adjuster (No.2) to the clockwise,
the pulley timing mark
mark
B
comes down. The angle adjuster (No.2) is enclosed in the accessory box.
A
B
From the library of Superior Sewing Machine & Supply LLC • www.supsew.com
1
2
5
3
B
are matched with each other then, the sewing machine is stopped
A
and
B
goes up and if turn it to the counter clockwise, the pulley timing
A
then, if tighten the nut
B
, it becomes narrower.
A
6
B
get out of the matching more than 3mm,
― 31 ―
B
, the discs opening
B
A
and the pulley timing
1
C
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents