7

Commissioning

Notice!
If the indicators flash during the initial commissioning, a calibration must first be performed
on a single sheet.
First apply operating voltage. An alignment mode is available for commissioning. This can
be used to check the alignment of the transmitter and receiver.
Alignment mode
Press the TEACH IN button
for > 5s and < 10s
Notice!
After exiting alignment mode, it is absolutely necessary to perform a calibration.
Leuze electronic
LED
green:
LED
yellow:
LED
red:
DB 112 B
LEDs
and
flash synchronously at 3Hz
Alignment
Exit:
OK
press the TEACH IN button < 5s
Align transmitter and receiver until
LED
Only then is it possible to exit align-
Alignment
ment mode!
critical
Extraordinary exiting of alignment
mode is possible only by means of
Power OFF!
Align transmitter and receiver until
LED
Only then is it possible to exit align-
Alignment
ment mode!
bad
Extraordinary exiting of alignment
mode is possible only by means of
Power OFF!
Commissioning
is green.
is green.