BT100-2J OPERATING MANUAL BT100-2J OPERATING MANUAL Table of Contents IMPORTANT INFORMATION: Please read operation manual carefully before operation. Introduction WARNING: Basic Operation Tubing breakage may result in fluid sprayed from pump. Use Start/Stop appropriate measures to protect operator and equipment. Please check the tubing frequently and changing the tubing in time.
BT100-2J OPERATING MANUAL Basic Operation Introduction Acceptable pump heads for BT100-2J are YZ1515x, YZ2515x, YZII15, YZII25, DG-1 and DG-2. The pump delivers flow rates from 0.002 to 380 mL/min. The speed can be adjusted manually or automatically through external control interface. Store the running parameter automatically.
0. 8- 1 0.002-32(10 ) Wall Thickness Rollers 0 - 10 KHz pulse input speed control D G - 1 Communication Control Please contact Longer Company for communication protocol. 0.0025-48(6 ) 3. 7 mm Rollers Inner Diameter ≤ 0 .8 -1 0.002-32(10 )...
BT100-2J OPERATING MANUAL BT100-2J OPERATING MANUAL Analog Control Show as below for external control module. If you need external control function you just insert the external control module to the 4 20 mA, 0 - 5V, 0 10V external control interface which is on the rear panel of the pump.
BT100-2J OPERATING MANUAL Technical Specifications Functions Acceptable Pump Heads: YZ1515x, YZ2515x, YZII15, YZII25, DG-1, DG-2 External Control: Start/stop, cw/ccw control and speed control (0 - 5 V, 0 - 10 V, 4 - 20 mA and 0 - 10 KHz optional)
Page 6
BT100-2J PERISTALTIC PUMP OPERATING MANUAL Baoding Longer Precision Pump Co.,Ltd. Building A, Chuangye Center Baoding National High - Tech Industrial Development Zone Baoding, Hebei, China 071051 Tel: 86 - 312 - 3110087 Fax: 86 - 312 - 3168553 E - mail: longer@longerpump.com Http://www.longerpump.com...