1.
Begin by placing the back panel on a flat non-marring surface, making sure the
pre-drilled holes are facing up. Next, position the box platform onto the back
panel by aligning the mounting holes with the pre-drilled holes on the back panel.
2.
Using the screws from the HK-104 kit, fasten the box platform to the back panel,
making sure the bottom edges are flush and that the box platform is centered,
as shown above. If neccessary, loosen the screws slightly, adjust the location, and
re-tighten the screws.
WITH X9 OPEN SHELF STORAGE OPTION
PART # 1609103
BOX
PLATFORM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COACT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for First Office COACT

  • Page 1 COACT PART # 1609103 MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION INSTALLATION INSTRUCTIONS Begin by placing the back panel on a flat non-marring surface, making sure the pre-drilled holes are facing up. Next, position the box platform onto the back panel by aligning the mounting holes with the pre-drilled holes on the back panel.
  • Page 2 COACT PART # 1609104 MEDIA UNIT ASSEMBLY WITH H4R/H4Q OPEN SHELF STORAGE OPTION INSTALLATION INSTRUCTIONS Begin by placing the back panel on a flat non-marring surface, making sure the pre-drilled holes are facing up. Next, position the box platform onto the back panel by aligning the mounting holes with the pre-drilled holes on the back panel.
  • Page 3 COACT PART # 1609105 WIRE MANAGER INCLUDED WITH H4Q INSTALLATION INSTRUCTIONS NOTE: Depending on how your Media Unit is being utilized, it could require cutting the Wire Manager to the appropriate length. If it is necessary to cut the Wire Manager, measure to the desired length, and using a square and utility knife, score the Wire Manager multiple times along the top face.
  • Page 4 COACT PART # 1609106 CORNER MEDIA UNIT INSTALLATION INSTRUCTIONS Begin by assembling the “L” shape back panel as illustrated in the upper most view. Place the back panel onto the end panel, making sure the shoulder screw is inserted into the pocket on the end panel and above the slot opening of the mod-eez clip as shown in the detail view above.
  • Page 5 COACT PART # 1609107 SHEET 1 RUNOFF TABLE INSTALLATION INSTALLATION INSTRUCTIONS NOTE: It is recommended to install the Runoff Table after the Media Unit has been placed in its final resting position. Begin by placing the worksurface on a flat non-marring surface, making sure the pre- drilled holes are facing up.
  • Page 6 RUNOFF TABLE INSTALLATION CONTINUED PART # 1609107 SHEET 2 INSTALLATION INSTRUCTIONS NOTE: It is recommended to install the Runoff Table after the Media Unit has been placed in its final resting position. Using the view above, measure the distance required for Making sure the worksurface is centered with the Media Unit your Runoff table height and scribe a temporary line to mark and the bottom edge aligns with the scribed line, fasten the...
  • Page 7 COACT PART # 1609108 MEDIA UNIT GANGING CONNECTION INSTALLATION INSTRUCTIONS Starting with one of the Media Units, insert the dowel pins from the HK-126 kit halfway into the bored holes on the back panel, as shown above. Next, slide the adjoining Media Unit against the connecting Media Unit, making sure the dowel is inserted into the aligning hole.

Table of Contents