SGT-750 Operation & Maintenance
Maintenance Level Schedule
Fast Inspections
1 day A-inspection (Borescope)
2 days B-inspection (Gas Generator
Exchange)
5 days C-inspection (Gas Generator
Exchange with Power Turbine Insp.)
Total service cycle downtime 17 days
Page 3
+
Annual On-load Performance Inspections
(without downtime)
Normal Inspections
1 day A-inspection (Borescope)
12 days B-inspection (Hot Section
Parts Replacement)
16 days C-inspection (Overhaul)
Total service cycle downtime 48 days