Main Menu
Front Wheelhouse/Damper Housing
Installation (cont'd)
8. Weld the wheelhouse upper inner (A) and dashboard
upper side member (B).
(X): Drill the holes for welding the new wheelhouse
upper inner.
B
(X)
A
(6)
A
(1)
9. Weld the damper housing (A) and wheelhouse upper
inner (B).
A
(3)
(6)
3-10
Table of Contents
B
(4)
A
(2)
B
10. Weld the front wheelhouse (A) to the damper housing
(B), front side frame (C), and wheelhouse upper inner
(D).
B
C
(2)
A
Front
(6)
A
(3)
D
(2)
(4)
(1)
B